
Motorists and commuters were left stranded for several hours on Wednesday following a massive traffic gridlock triggered by the resumption of pedestrian bridge construction at the Aseese axis of the Lagos-Ibadan Expressway.
The traffic congestion, which reportedly lasted for up to eight hours, disrupted movement in both directions, with vehicles heading towards Lagos experiencing heavy delays from the Redemption Camp area to Aseese bus stop. Motorists travelling towards Ogun State were also held up from the Long Bridge area.
Some commuters reportedly abandoned their vehicles and trekked several kilometres to reach their destinations, while commercial motorcycle operators took advantage of the situation to increase fares. One rider reportedly demanded as much as ₦6,000 for a trip from Mowe to Ibafo.
A motorist, Ifeanyi Chukwuebuka, criticised the decision to carry out the construction during the daytime, arguing that the exercise had disrupted people’s businesses and daily activities. He urged the government to consider scheduling similar projects at night to reduce inconvenience to road users.
Another motorist, identified as Kabiru, lamented the recurring traffic situation whenever construction work takes place along the expressway, calling for lasting measures to address the problem.
Related News:
Lagos Ramp Collapse Causes Traffic Gridlock
Multi-Vehicle Crash Causes Heavy Gridlock on Lagos-Ibadan Expressway
Motorists Spend Over Three Hours in Gridlock on Lagos–Benin Expressway
Reacting to the development, the acting Controller of the Federal Ministry of Works in Ogun State, Adeleye Olajide, said the bridge installation was necessary and explained that the government was working towards completing the project before the festive season.
Meanwhile, the Ogun State Traffic Compliance and Enforcement Agency (TRACE) disclosed that the temporary traffic diversion would last from Wednesday, November 18, to Sunday, November 22, 2026.
According to the agency’s spokesperson, Babatunde Akinbiyi, the Federal Ministry of Works, in collaboration with CBC Construction Company, commenced the diversion to facilitate the installation of the pedestrian bridge opposite Christ Embassy at Aseese.
Motorists were advised to exercise patience, approach the construction area with caution and comply with traffic instructions from officials. TRACE and the Federal Road Safety Corps (FRSC) are expected to deploy personnel to manage traffic and minimise delays during the construction period.